Eventi
01 lug 2010 New cablecar Tulot
In december 2010 Funivie Pinzolo SpA will present the new cablecar Tulot that will go up, from 850 meters to Malga Cioca, at 1600 meters.
The new cablecar (cabines with 8 seats, 2.000 people for hour, 7 minutes to go up) will have a new slope coming down right to the valley, called Tulot, 2,5Km long.
The Tulot slope, combined with the existing slopes, will get the new DoloMitica, an exstraordinary slope which will come down from 2100 meters to 850 meters.
Tha DoloMitica will have two different tracks: the DoloMitica Star, 3,5 Km long, with a medium difficult of 35%, and the DoloMitica Tour, 5,5 Km long with a medium difficult of 22%.
You'd better try it!
We'll be waiting for you!
© 2007 Funivie Pinzolo Spa | Contatti | Privacy Cap. soc. 19.769.982,48 | Reg. Imprese Tn CF e P.IVA 00180360224 | C.C.I.A.A. Trento 72892
made in kumbe







